Retro · 2026-08-05 · Camellia Apartments

Vendor Inbound: the A&K Repeat

What went wrong when a vendor tried to schedule a delivery, why it was a repeat of a July incident, what we shipped same-day, and the longer-term opportunity areas. Long-term section: NOT a short-term priority

What happened (all times CT, Aug 5)

Resolution: a human called Maddie back same day and confirmed Friday's delivery and the unit 422 appliances. Customer-side, closed.

Why it happened

1. Clara has no way to save what an inbound vendor tells her. No tool on the vendor voice lane can record a vendor-proposed date, create a task, or notify the PM. The promise "I'll get that to the property manager" has no mechanism behind it — it is words only.
2. The say–do checker was told to ignore exactly this sentence. The guard that compares what Clara says against what she does deliberately whitelists the pass-along phrase ("honest-but-wrong stays silent"). So the broken promise raised no alarm.
3. This is a repeat, not a surprise. The same vendor triggered the same failure class on July 18 — three calls in a day, a request treated as "the team will follow up." That incident produced better vendor identification (which worked: Maddie was fully recognized) but not vendor capture. The fix proposal (ADR-0113) has sat in "Proposed" since then. Aug 5 is the July incident happening again, 18 days later, unfixed.

Contributing color: everything shipped since July went to the outbound vendor lane (robo-vendor battery, Willows go-live Aug 3). Inbound-cold-call capture was never anyone's sprint.

What we shipped same-day (PR #5469)

Transfer-first dial-down. Per-property switch: recognized vendor + office open → Clara says a warm word and hands the call to the office instead of trying to work it. Emergencies still hit the safety lane; moving an already-booked visit Clara still does herself (that write path works); after-hours behavior unchanged. Off by default everywhere; turning on for Camellia. Every transferred call keeps its full recording + transcript, which grows the corpus we tune capture against — dialing down feeds the long-term fix.

The chosen arc (Fede, Aug 5): shadow → scribe → jump back in slowly

1. Shadow mode now. Vendors always get transferred to the office; Clara listens but doesn't try to help yet. (= the dial-down above, on for Camellia.)

2. Shadow scribe next — the first pass at adding value without getting in the way. Listen to the transferred human leg and put agreed jobs/days on the property calendar (marked unconfirmed). Not built yet, but ~70% of the parts exist: post-transfer transcription works, the outcome extractor works, the calendar projection works (jobs Clara herself books already land on the calendar — PRs #4622/#4380/#4920). The missing wire: run the extractor on the post-transfer transcript and let it write a calendar entry without requiring a bound work order.

3. With more data and examples, Clara re-enters lane by lane — capture+notify, then handling — each step gated on the gauntlet proving it (the eval suite now grades the transfer-first posture directly).

Long-term opportunity areas not prioritized short-term

Recorded so the vision isn't lost; none of this is scheduled. Roughly in impact order.

A. Vendor capture — the durable fix (needs a decision)

Give Clara a durable record for what vendors ask for: a visit/commitment entry keyed to property + unit + job, plus a capture-and-notify path so "Friday the 7th" becomes a stored item the PM sees and Clara can read back on the next call. This is ADR-0113's Phase 1; the dial-down's own rollback trigger points at it. Decision needed:

Recommended · Option 1
Ship ADR-0113 Phase 1 as scoped (commitment record + capture-and-notify on the existing lanes).
Smallest path to "vendors' words survive." Reuses the existing note-delivery leg. Exit criteria for the dial-down are already written against it.
Option 2 — Minimal capture only: bind the existing note tool onto the vendor lane, skip the commitment record.
Days not weeks, but notes aren't structured — no read-back on the next call, no calendar tie-in, and we likely rebuild it later.
Option 3 — Stay transfer-first indefinitely; revisit after Yale onboarding.
Zero eng cost now; accepts that the office owns vendor scheduling and Clara never learns the lane. The corpus keeps growing either way.

B. Promises must be mechanically backed

Principle worth adopting lane-wide: Clara may not say she'll do a thing unless a tool call records it. Concretely: un-whitelist the pass-along phrase in the say–do guard and make "promise with no write" page someone. Cheap, catches whole classes of future incidents, not just vendors.

C. Trust the timeline

Two small integrity bugs made the PM's view actively misleading: the call summary inverted who called whom, and a fully-identified vendor still displays as "Unknown caller." Small fixes; disproportionate trust damage when the PM reads the log while a vendor is chasing them.

D. Vendor contact data is the root constraint

78 of 814 vendors have a phone on file; 27 have email; A&K — 211 bills at Camellia — has neither. Any future where Clara coordinates vendors proactively (confirmations, reminders, reschedules) needs a contact-coverage push, PMS-side or ours.

E. Graduated autonomy as the operating model

The dial-down switch generalizes: new properties start transfer-first, and Clara earns lanes back per property as the eval suite proves them (the gauntlet now grades the transfer-first posture directly). "Onboard cautious, dial up on evidence" could become the standard rollout posture for every capability, not just vendor inbound.

Status

ItemState
Maddie / Friday delivery + unit 422 (PO 695)Confirmed by a human, Aug 5
Transfer-first dial-down (PR #5469)In review pipeline; flipping on for Camellia at merge
Shadow scribe (post-transfer → calendar)Chosen as the next value step; not yet built or scheduled
A — vendor capture decisionWaiting on Fede (options above)
B, C — guard + timeline fixesSmall PRs, unscheduled
D, E — data coverage, graduated autonomyVision, unscheduled

Sources: prod conversation records for the four Aug 5 calls; the five-agent investigation of the same day; ADR-0113; the rated Camellia vendor corpus. Quotes are verbatim from call transcripts.