PR #13164 — Turnovers, one building picked: the loading table drops Property
Board row p11-x-skeleton-everywhere. PR #13164.
| What | Loading, before | Loading, after | Loaded page | Verdict |
|---|---|---|---|---|
| Columns | 8: Unit, Property, Tenant, Move-Out Date, Stage, Work Orders, Charges, Days in Turn | 7: Unit, Tenant, Move-Out Date, Stage, Work Orders, Charges, Days in Turn | 7: Unit, Tenant, Move-Out Date, Stage, Work Orders, Charges, Days in Turn | ✓ matches |
| Table top (y) | 395px | 395px | 395px | ✓ matches |
Screenshots, notes, and how they were captured
Building picked the way a person picks it, for a building the picked company holds. The outside-company case is covered by the unit test. This PR also removes the KNOWN DRIFT note that described this exact gap.
How these were captured. Local dev servers bound to the
propflow-stage table (anonymized by construction), signed in as the smoke login, desktop 1440×900. The loading screen is held on screen by an uncommitted local hook (a cookie-gated wait in the list's page.tsx) that is in no PR. Values are read from the rendered DOM. Before = the code before this PR; after = with it.